NEW AGE OFFICE BUILDING

 

Following an invitation-only competition, we submitted the conceptual design for the office building to the investor, CPI, in January 2019. As the winners of the competition, we have been working on the detailed design of the building in several stages, and we currently hold a valid building permit. Despite the delays and uncertainties caused by the COVID-19 situation, the construction plans were finally completed in 2022.

The location of the building presented several challenges for us. Situated in the vicinity of Agora, enclosed by Dunavirág, Párkány, and Esztergomi streets, the block stands out visually in a prominent position along the curved line of Róbert Károly Boulevard, leading to Árpád Bridge. Although it is just one among numerous office buildings, it captures attention due to its unique visual presence. It is clearly visible from all vehicles approaching or leaving the bridge, creating a dynamic and ever-changing image. We aimed to express this flow and momentum in the design of our building, and it was greatly facilitated by the fact that CPI commissioned us to create an interesting and exciting structure that stands out in its surroundings.

The massing of the building is a combination of curved elements, responding to the lines and movements of the environment, while producing functionally flawless office floor plans. The radius of the curves allows the overall composition of the facade sections, created from straight elements, to remain curved. The intersection of the vertical mass elements at varying heights creates a dynamic and favorable impression from all directions. Special attention was given to the main entrance, which is situated beneath a large mass element, clearly indicating its location.

The facade treatment is extremely simple, composed of horizontal elements that delineate the curved forms, harmonizing well with the ribbon windows commonly found in office buildings. The facades are supplemented with colored shading elements that serve multiple functions, participating not only in sun shading but also in energy supply. The process of adapting the building to the most advanced energy supply systems is currently underway. The construction of the building has not yet begun, but as far as we know, the investor is eagerly anticipating it, just as we are…